Accuracy of control networks is critical since this information is used for site reoccupation.
- Review metadata information for monuments, benchmarks,control points, and markers. Note that elevations were reviewed during the Measurement Review (Step 3).
- Review and update UTM coordinates as needed. Note that Benchmark and Control Point errors were likely repaired during Topo data review.
- Review notes in these tables and address any outstanding control network questions. Leave control network metadata in a condition that allows easy use for the next visit to a site.
- Set the QA status for the following Measurement Types:
- Benchmark
- Site Marker
- Control Point
- Monument
Return to QA HOME